Stek advises Nuon on acquisition of solar park projects
Stek advised Nuon on its acquisition of two solar park projects from developer Powerfield, and has an option to acquire a third solar park. In total, the three parks add up to 27.5 MW. The locations of the parks are in Coevorden (7 MW), Gasselternijveen (3,5 MW) and Dokkum (17 MW).